Maximize technical availability of equipment plant, promoting and introducing analytical problem‑solving techniques to maximize overall asset effectiveness.
Deliver all drawings and equipment documentation for new equipment on site. 100% of these should be available as a soft copy and attached to the CMMS.
Cooperate with engineering team to identify and eliminate potential losses at the design stage. Stable machine cycle time and increased mean time between failure (MTBF).
Integrate new equipment into existing lines. Deterioration is easily measured and corrected. Routine maintenance tasks are easy to perform and carried out by internal personnel. Short MTTR.
Do a critical analysis for all new spare parts recommended related to technical documentation.
Develop predictive routines like thermographies and vibrations.