Coordinate and ensure the timely supply of productive material in order not to run short or stop the line.â Daily Critical Parts Report (Daily Start UP, Halftime)âÂÂ. Maintain low inventory level On Hand and In yard.â Dispose of obsolete material as much as possible.â Avoid expired material in the plant.â Review and remove ASN too long, Out of Balance, Negative Parts.â Work with the following Systems: On line (Stock Status, MIP3 Epics, Critical Shortages, Champs (Under and over shipments, Shipment tracking), PC Portal (Follow Up),CSDS (CSDS Inquiry)â Audit Material Verification to ensure receipts are properly captured.â Be in contact with the departments involved so that the disposition of non-conforming material is carried out in the appropriate time.â Analyze weekly the Balance to Excess report to obtain information on potentially obsolete material.â Prepare a database of the dual tables to determine the am...