Where Work Meets Adventure
The Pickering Nuclear Generating Station refurbishment program involves designing and building a new deep‑water intake in Lake Ontario to improve the plant's cooling system. This work includes a 1.5 km long tunnel built by a pressurized 10.15 m diameter slurry TBM, two vertical shafts (onshore and offshore), and an offshore modular intake structure resting on the lake bed.